Important alert

This is an important announcement

Disruption to Euston services due to damaged overhead power lines.

 
Check times & buy tickets

more options

:
:

Add to: iGoogleYour site

Engineering works

Live travel info

Timetables

 

Station info

 

Route map

You are here: Home > Your journey > Engineering works

Engineering works

EngineeringWe're constantly working to improve our services which means engineering work can sometimes disrupt services. We do our best to minimise the effects on services.

This page contains details of planned engineering work over the next few weeks. For information about engineering works further ahead, please see the National Rail Enquiries website.

To view the Full details pdfs on this page you will need the Adobe Acrobat Reader.

Summary of engineering works planned for February and March 2010

Full details

Tipton station closed until May 2010

Trains won't be able to stop at Tipton station until May 2010 whilst Network Rail completes a new £2 million upgrade of the station. The improvements include new, safer platforms, better car park access and a new waiting area.

During the closures, we'll be running buses between Tipton and Coseley, connecting with trains to and from Birmingham and Wolverhampton. Buses will pick up and set down at the Corals bookmakers in Tipton and in Fullwoods End bus stop (near the junction with Havacre Lane) in Coseley.

Download a bus replacement timetable (pdf format)

Valid from 13 December 2009

Monday 8 February 2010

Due to planned engineering work late night trains from London Euston to Northampton will arrive at Northampton up to 55 minutes later. After 2230 northbound trains will not call at Bushey.

Full details

Tuesday 9 - Thursday 11 February 2010

Due to planned engineerig work the following services will not call at Bushey.

  • 2234 London Euston to Milton Keynes Central
  • 2334 London Euston to Milton Keynes Central
  • 0034 London Euston to Northampton

Friday 12 February 2010

Due to planned engineering work the 0034 London Euston to Northampton will not call at Bushey.

Saturday 13 February 2010

Due to planned engineering work the 0034 London Euston to Northampton service will not call at Bushey.

Sunday 14 February 2010

Due to planned engineering work, until 1200 hours trains between London Euston and Northampton will run between London Euston and Milton Keynes Central, with rail replacement buses operating between Milton Keynes Central and Northampton.

Full details

Do to planned engineering work the 1037 Crewe - Stafford service and the 1141 Stafford - Crewe service will not run.

Full details

Monday 15 to Wednesday 17 February 2010

Due to planned engineering work the 2318 Birmingham New Street to Hednesford will terminate at Walsall.

A rail replacement bus service will operate departing from Walsall at 2357, Bloxwich at 0006, Bloxwich North at 0012, Landywood at 0023, Cannock at 0035 and arriving Hednesford at 0042.

Saturday 20 February 2010

Due to planned engineering work services between Birmingham New Street and Shrewsbury will operate to an amended timetable. Trains will run between Birmingham New Street and Wellington, not calling at Oakengates, rail replacement buses will operate between Telford Central and Shrewsbury (also calling at Oakengates and Wellington).

Full details

Sunday 21 February 2010

Due to planned engineering work train services between Coventry and Nuneaton will not run. Rail replacement buses will operate to the attached timetable.

Full details

Monday 22 February 2010

Due to planned engineering work the following train service alterations will apply. Late night trains from London Euston to Northampton will arrive at Northampton up to 36 minutes later. After 2230 hours northbound trains will not call at Bushey.

Full details

Tuesday 23 - Thursday 25 February 2010

Due to planned engineering work the following services will not call at Bushey.

  • 2234 London Euston - Milton Keynes Central
  • 2334 London Euston - Milton Keynes Central
  • 0034 London Euston - Milton Keynes Central

Friday 26 February 2010

Due to planned engineering work the 2334 London Euston to Milton Keynes Central and the 0034 London Euston to Northampton services will not call at Bushey.

Saturday 27 February 2010

Due to planned engineering work the 0034 London Euston to Northampton service will not call at Bushey.

Due to planned engineering work services between Birmingham New Street and Shrewsbury will operate to an amended timetable. Trains will run between Birmingham New Street and Wellington, not calling at Oakengates. Rail replacement buses will operate between Telford Central and Shrewsbury (also calling at Oakengates and Wellington).

Full details

Sunday 28 February 2010

Due to planned engineering work until 0720 hours trains between London Euston and Milton Keynes Central/Northampton will not run and rail replacement buses will operate.

Full details

Due to planned engineering work train services between Coventry and Nuneaton will not run. Rail replacement buses will operate to the attached timetable.

Full details

Monday 1 - Thursday 4 March 2010

Due to planned engineering work the 2253 Birmingham New Street to Northampton service will not call at Long Buckby and will arrive at Northampton later (0021). A rail replacement bus service will operate departing from Rugby at 2343, Long Buckby at 0009 and arriving Northampton at 0034.

Monday 1 & Tuesday 2 March 2010

Due to planned engineering work the 2353 Birmingham New Street to Coventry service will terminate at Birmingham International. A rail replacement bus service will operate departing from Birmingham International at 0014, arriving Coventry at 0039.

Wednesday 3 & Thursday 4 March 2010.

Due to planned engineering work the 2353 Birmingham New Street to Coventry will not run. A rail replacement bus service will operate departing from Birmingham New Street at 2353, Marston Green at 0012, Birmingham International at 0017 arriving Coventry at 0042.

Sunday 7 March 2010

Due to planned engineering work services between Birmingham New Street and Northampton will operate to an amended timetable.

Full details

Due to planned engineering work services between London Euston to Northampton/Crewe will operate to an amended timetable.

Full details

Monday 8 March 2010

Due to planned engineering work late night trains from London Euston to Northampton will arrive up to 36 minutes later. After 2330 northbound trains will not call at Bushey.

Full details

Tuesday 9 - Friday 12 March 2010

Due to planned engineering work the following services will not call at Bushey.

  • 2334 London Euston to Milton Keynes Central
  • 0034 London Euston to Northampton

Saturday 13 March 2010

Due to planned engineering work the 0034 London Euston to Northampton service will not call at Bushey.

Sunday 14 March 2010

Due to planned engineering work services between Birmingham New Street and Northampton will operate to the following amended timetable. Trains will run between Birmingham New Street and Coventry/Rugby. Rail replacement buses will operate between Rugby and Northampton.

Full details

Due to planned engineering work services between London Euston and Northampton/Crewe will operate to the following amended timetable.

Full details

Sunday 21 March 2010

Due to planned engineering work until 0915 hours trains between London Euston and Northampton will run between London Euston and Milton Keynes Central, with rail replacement buses operating between Milton Keynes Central and Northampton.

Full details

Monday 22 March 2010

Due to planned engineering work late night trains from London Euston to Northampton will arrive at Northampton up to 50 minutes later. After 2230, northbound trains will not call at Bushey.

Full details

Tuesday 23 - Thursday 25 March 2010

Due to planned engineering work the following services will not call at Bushey:

  • 2234 London Euston - Milton Keynes Central
  • 2334 London Euston - Milton Keyens Central
  • 0034 London Euston - Northampton

Friday 26 March 2010

Due to planned engineering work the 2234 and 0034 London Euston to Northampton services will not call at Bushey.